CONSTRUCTION 2008 - BUILD A REPAIR SHOP

 

East Side Retaining Wall, 2,000 lbs. of Rock Before

1st Concrete Pour to create Primary Foundation Before

2nd Concrete Pour to Stabilize Hillside Before

Post and Beam Before

Skunk Proofing Before

Deck Construction Before

Floor Construction Before

Insulate Floor Before

Tree Trimming Before

Framing Before

Plywood Before

Windows Before

Roof Before

Back Railing Before

Front Railing Before

Insulation Before

Sheetrock Before

Laminate Floor and Trim Before

Painting Before

Corinne's Back Studio Before

Corinne's Front Studio Before

Piano Moving Before

Soundproof Windows Before

East Side Retaining Wall, 2,000 lbs. of Rock After

1st Concrete Pour to create Primary Foundation After

2nd Concrete Pour to Stabilize Hillside After

Post and Beam After

Skunk Proofing After

Deck Construction After

Floor Construction After

Insulate Floor After

Tree Trimming After

Framing After

Plywood After

Windows After

Roof After

Back Railing After

Front Railing After

Insulation After

Sheetrock After

Laminate Floor and Trim After

Painting After

Corinne's Back Studio After

Corinne's Front Studio After

Piano Moving After

Soundproof Windows After